Every IP water test ends with a number: litres per minute and kilopascals. Both are measured, both have a tolerance of about five percent, and both drift for reasons that have nothing to do with the sample.
The drift is boring and predictable: a partially blocked nozzle reduces flow and raises pressure, a worn nozzle bore does the opposite, and a fouled flow meter reads low. None of them announce themselves.
What to measure, and where
| Quantity | Where measured | Instrument | Frequency |
| Flow | In the line upstream of the nozzle | Turbine or electromagnetic meter, ±2 % | Every test, logged |
| Pressure | At the nozzle, jet running | Bourdon or transducer, ±2.5 % | Every test, logged |
| Nozzle bore | At the orifice, three directions | Pin gauges or optical | Quarterly |
| Spray pattern | On a target plate at the specified distance | Visual, photographed | Quarterly |
| Water temperature | In the reservoir | Thermometer | Daily |
| Conductivity | In the reservoir | Meter | Monthly |
Pressure at the nozzle is the one that is most often measured in the wrong place. A gauge on the pump discharge reads the pump effort; the jet is driven by what is left after the hose.
Why bore wear matters more than it looks
A 6.3 mm nozzle worn to 6.5 mm has three percent more area. If the pump holds the same pressure, the flow rises by about three percent, and the test gets slightly harsher. On a 12.5 mm nozzle used at 100 l/min the same wear is easier to miss, because the flow meter is often sized for a much wider range and reads 12.5 as a small number.
- Use a meter sized for the working range. A meter that tops out at 200 l/min cannot resolve a three percent drift at 12.5.
- Check the spray pattern, not just the numbers. A partly blocked hole changes the pattern before it changes the total flow.
- Record the reservoir level. A falling level changes the suction head and, on some pumps, the pressure.
- Keep a reference nozzle. Swap it in once a quarter and compare the rig reading to the declared value.
What an auditor asks for
Not a certificate for the pump, but a log that shows the measured flow and pressure for each test, the nozzle identification, and the calibration status of both instruments. Three lines per test is enough, and it converts a claim into a record.
Our IP water test equipment ships with the meter and gauge mounted at the nozzle, and the technical notes list the calibration intervals we recommend for each class.
Standards referenced: IEC 60529 clause 14.2, ISO/IEC 17025 clause 6.4 (equipment), ISO 5167 for flow measurement practice.
The five minute check that saves a re-test
Before every test, run the jet into a calibrated container for 30 s and compare with the meter. On an IPX6 rig that is 50 litres, which is easy to measure with a marked drum and a stopwatch; a 5 percent deviation is visible immediately and costs five minutes instead of a full re-test.
Record the drum reading next to the meter reading. When the two diverge, the meter is the suspect.